Florence, SC - Freedom Boulevard 30" Water Line

The work to be done consists of furnishing all materials, equipment and labor necessary to construct Freedom Boulevard 30” Water Line – Base Bid, consisting of the approximate quantities: +/- 5,615 LF of 30" DIP waterline along Freedom Blvd (US HWY 301). +/- 1,000 LF of 12" DIP and 1,125 LF of 12" PVC along Becky's Pkwy (S-21-1350) to connect to existing 12" water line. +/- 1,178 LF of 8" DIP along Saint Beulah Rd.(S-21-859) to connect to existing 8" water line. All associated water appurtenances. Bid Alternative 1 and Bid Alternative 2 consist of the approximate quantities: +/- 400 LF of 36" HDPE Directional Drill +/- 9,600 LF of 30" DIP waterline along Freedom Blvd (US HWY 301). All associated water appurtenances.
You need to register or login to view files and more project information.

Status

Accepting Bids

Bid Date 11/6/25 2:00pm

Company & Contacts

AECOM
Michael Henry Jr.  

Location

Florence, SC

For information regarding this project please contact:

Michael Henry Jr.

AECOM Technical Services, Inc.

michael.henryjr@aecom.com

The Information for Bidders, Bid Form, Contract, Plans, Specifications, Bid Bond, Performance Bond and Payment Bond, and other contract documents may be examined at the following locations:

Owner: City of Florence, SC

Engineers: AECOM Technical Services, Inc., Florence, SC.

Bidder must be an official plan holder and on the projects plan holders list for bid to be considered.

Bidders must deposit security with all bids. Security shall be in the form of a certified check or bid bond made payable to the Owner in an amount equal to not less than five percent (5%) of the amount of the bid. Provisions of the security shall be as described in the Information for Bidders. A one hundred percent (100%) payment bond and performance bond will be required. Contractor must provide fire, extended coverage, vandalism, and malicious mischief insurance equal to the actual value of the insured property during construction.