Florence, SC - Freedom Boulevard 30" Water Line

The work to be done consists of furnishing all materials, equipment and labor necessary to construct Freedom Boulevard 30” Water Line – Base Bid, consisting of the approximate quantities: +/- 5,615 LF of 30" DIP waterline along Freedom Blvd (US HWY 301). +/- 1,000 LF of 12" DIP and 1,125 LF of 12" PVC along Becky's Pkwy (S-21-1350) to connect to existing 12" water line. +/- 1,178 LF of 8" DIP along Saint Beulah Rd.(S-21-859) to connect to existing 8" water line. All associated water appurtenances. Bid Alternative 1 and Bid Alternative 2 consist of the approximate quantities: +/- 400 LF of 36" HDPE Directional Drill +/- 9,600 LF of 30" DIP waterline along Freedom Blvd (US HWY 301). All associated water appurtenances.