Public Projects
Bids Due in 30 days
6/17/25 10:00am
Spartanburg, SC - Yard Road Waterline Installation Project
Bids Due in 30 days
Spartanburg Water
Spartanburg, SC
Installation of approximately 5,100 of 8" DIP
Bids Due in 23 days
6/10/25 2:00pm
Mooresville, NC - Mazeppa Road Water and Sewer Improvements (20210774.00.CL)
Bids Due in 23 days
WK Dickson & Co., LLC.
Mooresville, NC
The work will consist of constructing a new water transmission main and new sanitary sewer force main for the Town of Mooresville
Bids Due in 25 days
6/12/25 10:00am
Thomasville, NC - 2024 Waterline Replacements Project
Bids Due in 25 days
LaBella Associates
Thomasville, NC
The Project consists of the construction of approximately 8,500 LF of 6-inch diameter ductile iron (DI) waterlines to replace existing 2-inch diameter galvanized waterlines along Fleer Road, Ford Street, Haywood Drive, Jones Avenue, Jones Circle, Lambeth Road, Pine Street, and Worrell Drive. The project also involves the transfer of existing water services and all other associated appurtenances.
Bids Due in 1 month
7/17/25 2:00pm
North Charleston, SC - RFP - General Contractor Services for ASR-9 Facility Construction
Bids Due in 1 month
CCAA
North Charleston, SC
The Charleston County Aviation Authority is requesting proposals from well qualified General Contractor firms with experience performing work on military installations to provide all labor, materials, and equipment and perform all work for the ASR-9 Facility Construction at the Charleston International Airport, North Charleston, SC.
Bids Due in 25 days
6/12/25 2:00pm
North Charleston, SC - Mulberry and Powerhouse Pump Station Upgrades (20240394.00.WK)
Bids Due in 25 days
WK Dickson & Co., LLC.
North Charleston, SC
The Mulberry and Powerhouse Pump Stations are being upgraded with the intent of replacing aged equipment, adding standby generators, and installation of new electrical equipment, controls, and generator on new raised platforms to flood-proof the pump stations. The project will include construction of the raised concrete platform, installation of Owner-provided generators, pump controls, and electrical equipment. Owner-provided new or refurbished pumps will be installed in each station. New stainless-steel piping will be installed in each station, each wet well will be thoroughly cleaned and the Mulberry Pump Station wet well will be structurally rehabilitated. Site improvements will include asphalt paving and new fencing at the Powerhouse Pump Station.
Bids Due in 11 days
5/29/25 2:15pm
Charleston, SC - Harbor View Elementary School Interior Painting
Bids Due in 11 days
Cumming Management Group
Charleston, SC
This Scope of Work includes but is not limited to; THE PROJECT: PAINTING AT HARBOR VIEW ELEMENTARY SCHOOL INCLUDING BUT NOT LIMITED TO CLASSROOMS, CORRIDORS, AND AREAS OUTLINED IN CONTRACT DOCUMENTS.
Bids Due in 23 days
6/10/25 2:00pm
Mooresville, NC - Mazeppa Road Water and Sewer Improvements
Bids Due in 23 days
Town of Mooresville
Mooresville, NC
The work will consist of constructing a new water transmission main and new sanitary sewer force main for the Town of Mooresville. Area 1 consists of approximately 1.5 miles of 16-inch water main. The proposed water main will run along Mazeppa Rd, generally paralleling an existing 12-inch water main, approximately 1.5 miles from the intersection with Hwy 115 to the intersection with Penske Way. Area 2 includes the abandonment of an existing 12-inch force main and re-routing its discharge location. The replacement will re-route the force main to a newly constructed (by others) gravity outfall with a new tie in manhole. The re-routed force main will be increased in size from the existing 12-inch to 16 inches.
Bids Due in 23 days
6/10/25 11:00am
Henderson, NC - Kerr Lake State Recreation Area Sewer Improvements
Bids Due in 23 days
Finch & Associates
Henderson, NC
The Project consists of the replacement of the existing septic systems for 5 access area dump stations at Henderson Point, Bullocksville, Nutbush, JC Cooper, County Line and their accompanying pieces. In addition, the project includes the rehabilitation of two septic system lift stations and two hydro-pneumatic tanks.
Bids Due in 23 days
6/10/25 2:00pm
Lititz, PA - Lancaster Airport - Construct Terminal Parking Lot (23066)
Bids Due in 23 days
Delta Airport Consultants
Lititz, PA
The Terminal Parking Lot project will include a new parking lot of approximately 150 parking spots. This project includes all required earthwork, grading, lighting, paving, and traffic coordination involved with the construction of the parking lot.
Bids Due in 22 days
6/9/25 3:00pm
Hillsborough, NC - Lawndale Basin Sewer Rehabilitation & Replacement
Bids Due in 22 days
Taylor Engineering & Consulting
Hillsborough, NC
Rehabilitation of approximately 5,200 LF of existing 8-inch sewers using Cured-In-Place Pipe (CIPP).