The Project includes the following Work: • Remove asphalt pavement, sidewalk, ramp, and slab on grade. • Relocate water and sewer services. Cap off existing sewer tap. • Excavate a trench in the alley for electrical conduit and a junction box. • Install 50LF of channel drain. Replace asphalt pavement, sidewalk, ramp, and slab on grade. • Air conditioning unit handling during construction. The Project has an expected duration of 45 days.