Seneca, SC - North Townville Street Alley Utilities
The Project includes the following Work: • Remove asphalt pavement, sidewalk, ramp, and slab on grade. • Relocate water and sewer services. Cap off existing sewer tap. • Excavate a trench in the alley for electrical conduit and a junction box. • Install 50LF of channel drain. Replace asphalt pavement, sidewalk, ramp, and slab on grade. • Air conditioning unit handling during construction. The Project has an expected duration of 45 days.
You need to register or login to view files and more project information.
Bid Set
(click to expand/collapse)

Name | Size | ||
N Townville St Alley Utilities Rel A | 3.0 MB | ||
_Contract docs N. Townville St. Alley Utilities | 2.1 MB | ||
_Technical Specifications 25.8.6 | 11.3 MB |