Asheville, NC - Taxiway A Rehabilitation and RON Parking

The Taxiway A Rehabilitation and RON Parking Project at Asheville Regional Airport (AVL) will include 5” nominal depth mill, crack seal, and asphalt overlay on existing Taxiway A, C, and D, as well as isolated full depth pavement removal and construction. Taxiway G will receive a 4” nominal depth mill and asphalt overlay in its current geometric condition. Connector Taxiways H and J will be removed full depth and a new Taxiway H and K will be constructed. Isolated areas of full depth reconstruction will be required on Taxiway A and D. The overall scope of work includes but is not limited to full depth asphalt pavement removal, asphalt pavement milling, removal and replacement of electrical items at all impacted taxiways and apron areas, crack sealing, earthwork, grading, base course construction, P-401 and P-403 asphalt paving, drainage and landscaping improvements, marking, and erosion and sediment control. The Project will also include revegetation of all disturbed areas due to construction activities including seeding, mulching and matting as required.
You need to register or login to view files and more project information.
Date Company Contact
1750414565
6/20/25 10:16 am
APAC Asheville
1188 Smoky Park Highway
Candler, NC 28715
Eddie Davies
Project Manager
Tel: 8652167045
1751472141
7/2/25 4:02 pm
ConstructConstruct
3825 Edwards Road
Suite 800
CINCINNATI, OH 45209
Construct Connect
Tel: 18003642059
1752056661
7/9/25 10:24 am
Dodge Data & Analytics
2860 S. State HWY 161
Suite 160 #501
Grand Prairie, TX 75052
Darlene Baker-Mann
Document Coordinator
Tel: 8443263826x9246
1751893052
7/7/25 12:57 pm
RG Tenney Electric, Inc
1213 Nathan Blvd
Suite A
Loganville, GA 30052
Ryan Tenney
President
Tel: 7703789255