REBID Hollywood, SC - Baptist Hill HS Athletic Improvements Phase 2
The work includes, but is not limited to, a new field house addition. Work includes but not limited to the masonry and brick walls, slabs and roof. Install power, IT, controls and fire alarm with HVAC system and the plumbing installation. It includes floor wall and ceiling finishes and equipment as per plans. Coordinate site access for field use with School.
You need to register or login to view files and more project information.
Bid Set
(click to expand/collapse)

Name | Size | ||
250501 OSF Approval_BHHS Ph 2 Drawings (1) | 27.0 MB | ||
250501 OSF Approval_BHHS Ph 2 Specs | 12.8 MB |