REBID Hollywood, SC - Baptist Hill HS Athletic Improvements Phase 2

The work includes, but is not limited to, a new field house addition. Work includes but not limited to the masonry and brick walls, slabs and roof. Install power, IT, controls and fire alarm with HVAC system and the plumbing installation. It includes floor wall and ceiling finishes and equipment as per plans. Coordinate site access for field use with School.
You need to register or login to view files and more project information.
Addendum #1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
25-CMG-B-015 Baptist Hill HS Athletic Ph 2 Add No. 001 with attachments 4.0 MB
Addendum #2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
25-CMG-B-015 Baptist Hill HS Athletic Ph 2 Add No. 002 With Attachments 2.3 MB
Addendum #3 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
25-CMG-B-015 Baptist Hill HS Athletic Ph 2 Add No. 003 187.0 KB
Addendum #4 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
25-CMG-B-015 Baptist Hill HS Athletic Ph 2 Add No. 004 with attachments 14.2 MB