Seneca, SC - North Townville Street Alley Utilities

The Project includes the following Work: • Remove asphalt pavement, sidewalk, ramp, and slab on grade. • Relocate water and sewer services. Cap off existing sewer tap. • Excavate a trench in the alley for electrical conduit and a junction box. • Install 50LF of channel drain. Replace asphalt pavement, sidewalk, ramp, and slab on grade. • Air conditioning unit handling during construction. The Project has an expected duration of 45 days.
You need to register or login to view files and more project information.

Status

Accepting Bids

Prebid Date 8/14/25 2:00pm
Bid Date 8/21/25 2:00pm