Public Projects
COMING SOON-Gallipolis, OH-Gallia-Meigs Reg. Airport-Rehab. Apron (Terminal 4,950 SY) 25016
Delta Airport Consultants
Gallipolis, OH
This project is to rehabilitate (mill-and-fill overlay) the existing terminal apron (pavement area approximately 4,950 SY) to provide aircraft parking in front of the newly constructed airport terminal building. The mill-and-fill overlay will be constructed of bituminous asphalt, meeting applicable FAA design standards for Group B-1 small aircraft for pavement strength, geometry, and aircraft parking. The scope of the project generally includes the following: • Approximately 2-inches of bituminous pavement milling. • Approximately 2-inches of FAA specification bituminous asphalt pavement overlay. • Install aircraft parking position tie-downs (approximately 15 EA). • The apron is to be marked to accommodate Group I aircraft parking and circulation around the apron to the taxiways and aircraft refueling area.
COMING SOON - Gallipolis, OH - Gallia-Meigs Reg. Airport - Expand Apron (Terminal) 1,500 SY (25015)
Delta Airport Consultants
Gallipolis, OH
This project is to expand the existing terminal apron by an additional 85 ft. (new pavement area approximately 1,600 SY) to provide aircraft parking in front of the newly constructed airport terminal building. The apron expansion will be constructed of bituminous asphalt, meeting applicable FAA design standards for Group B-1 small aircraft for pavement strength, geometry, and aircraft parking. The scope of the project generally includes the following: Site grading and installation of drainage structures and piping (approximately 4 drainage structures and 500 LF of piping). Construct approximately 85 ft. by 160 ft. FAA specification bituminous asphalt pavement on FAA specification compacted base and subbase material (approximately 13,600 SF total pavement area). Install aircraft parking position tie-downs (approximately 9 EA).
COMING SOON - New Plymouth, OH - Vinton Cty Airport - Reconstruct RWY 27 Turnaround Taxiway (23099)
Delta Airport Consultants
New Plymouth, OH
This project is to remove the existing Runway 27 approach end turnaround “button” pavement and reconstruct a new 25 ft. wide, bituminous asphalt turnaround taxiway at the location as shown on the Airport Layout Plan, meeting applicable FAA design standards for location, pavement width, and pavement strength. The scope of the project includes the following: Removal of existing turnaround button bituminous asphalt pavement, Runway Safety Area grading, seeding, and mulching (approximately 5,862 SF area). Grade and install drainage for turnaround taxiway on south side of Runway 27 end. Construct Runway 27 approach end 25 ft. wide, bituminous asphalt turnaround taxiway pavement (approximately 11,462 SF total pavement area) on south side of Runway 27 end. Construct Medium Intensity Taxiway Edge Lights (MITL) surrounding turnaround taxiway.
COMING SOON - Bryan, OH - Williams County Airport - 0G6-Rehabilitation Apron AP B (2,602 SY) 24026
Delta Airport Consultants
Bryan, OH
Rehabilitate the Apron AP-B (fuel farm area) concrete pavement by replacing several Portland Cement Concrete panels and repairing and sealing cracks, spalls, and joints for the remaining panels (approximately 2,602 SY area). Reconstruct two (ODOT 2-2-B) drainage inlets and associated piping located within Apron AP-B pavement area.
Bids due in 36 days
1/7/26 2:30pm
Abingdon, VA - Virginia Highlands Airport - West Side Development Phase 2 - Bid Package 1 (23069)
Bids due in 36 days
Delta Airport Consultants
Abingdon, VA
This project includes site work preparation for future development. The scope of the project includes the following: Installation of Drainage, Embankment and site grading for future development, Associated Erosion and Sediment Control Measures.
Bids due in 35 days
1/6/26 2:00pm
Abingdon, VA - Virginia Highlands Airport - Construct Hangar Site (Site 4) 23065
Bids due in 35 days
Delta Airport Consultants
Abingdon, VA
This project includes site work preparation for future hangar development. The scope of the project includes the following: Demolition of existing drainage features, Embankment and site grading for future development, Paving of apron area for future development, Installation of new drainage network, Associated Erosion and sediment control.
COMING SOON - Rockville, MD - Montgomery County Airpark - North End Hangar Development (24029)
Delta Airport Consultants
Rockville, MD
The North End Hangar Development project is for the erection of a box hangar at the Montgomery County Airpark. The project includes construction of the box hangar, foundations, stormwater conveyances, all utilities required for the building, and construction of an access drive and parking lot.
COMING SOON - Rural Retreat, VA - Mtn. Empire Ap. - Construct Taxilane and Hangar Sites (23038)
Delta Airport Consultants
Rural Retreat, VA
This project will consist of installation of erosion and sediment control measures, site grading, construction of retaining wall, site stormwater and drainage, construction of taxilane and apron pavements, and new pavement markings.
COMING SOON - Farmville, VA - Farmville Regional Airport - Replace Runway 3-21 PAPI's (24062)
Delta Airport Consultants
Farmville, VA
This project will consist of the replacement of the RW 3-21 PAPIs from the existing incandescent 2-unit PAPI systems on both ends of the runway with new 4-unit LED PAPIs systems.
COMING SOON - Quinton, VA - New Kent County Airport - Construct T-Hangars (Site Prep) 24052
Delta Airport Consultants
Quinton, VA
The T-Hangar Construction project is for the erection of a 12-unit T-Hangar at the New Kent County Airport. The project includes construction of the T-Hangar, foundations, stormwater conveyances, all utilities required for the building, and construction of a sidewalk.
