The project consists of the following:
1. Construction of a new two stage sewer pump station
a. Site preparation
b. Doghouse style gravity interceptor manhole
c. 10 ft diameter, 23 ft deep concrete wetwell
d. Duplex submersible pumps, duplex second stage pumps
e. Second stage pump building
f. Permanent diesel bypass pump
g. General electrical
2. Construction of approximately 21,450 linear feet of new sewer forcemain
a. Approximately 18,931 linear feet of 12-inch DR14 PVC by trench
b. Approximately 1,882 linear feet of 14-inch DR9 HDPE by directional bore, 6 locations
c. Approximately 468 linear feet of 10-inch DIP, 18-inch steel casing by jack and bore, 12 locations
d. Approximately 29 linear feet of 10-inch DIP, 18-inch steel casing by trench
e. Cut and patch driveways
f. Bore driveways
g. Clearing and grubbing as needed, sediment and erosion control, and restoration