Contract Time: Substantial Completion is 540 consecutive calendar days and Final Completion is 30 consecutive calendar days from Substantial Completion. The Contract will commence on the date stated in the Notice to Proceed.
No questions may be directed to or contacts made with members of Michael Baker International or Metropolitan Sewer Subdistrict that are not explicitly identified in this IFB as points of contact during the period of time that this IFB is made public until the final selection is made, except as otherwise provided for herein. Violation of this prohibition may disqualify the bidder from further consideration.
Award will be made to the lowest responsive and responsible bidder. The OWNER reserves the right to reject all bids or an individual bid, and to waive any informalities and technicalities in the bid. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof.
All Contractors are to provide a copy of their Contractor’s License with their bid and shall have the required classification for the scope of the work.
Please note additional attachments on South Carolina Business Opportunities (SCBO)
Procurement Services: Design Drawings and Specifications
Bids must be accompanied by a bid bond equal to five percent (5%) of the total Base Bid amount.
The Pre-Bid Meeting will be held in-person at Metro’s office: 120 Augusta Arbor Way, Greenville, SC 29605. A Microsoft Teams option will be available for all interested bidders who are unable to attend in-person. The interested bidder shall contact the Engineer (ellen.chassereau@mbakerintl.com) and provide an email address for the attendee(s) to receive the Teams Meeting invite and link.