COMING SOON - New Plymouth, OH - Vinton Cty Airport - Reconstruct RWY 27 Turnaround Taxiway (23099)

This project is to remove the existing Runway 27 approach end turnaround “button” pavement and reconstruct a new 25 ft. wide, bituminous asphalt turnaround taxiway at the location as shown on the Airport Layout Plan, meeting applicable FAA design standards for location, pavement width, and pavement strength. The scope of the project includes the following: Removal of existing turnaround button bituminous asphalt pavement, Runway Safety Area grading, seeding, and mulching (approximately 5,862 SF area). Grade and install drainage for turnaround taxiway on south side of Runway 27 end. Construct Runway 27 approach end 25 ft. wide, bituminous asphalt turnaround taxiway pavement (approximately 11,462 SF total pavement area) on south side of Runway 27 end. Construct Medium Intensity Taxiway Edge Lights (MITL) surrounding turnaround taxiway.
You need to register or login to view files and more project information.
No plan holders available for this project