High Point, NC - Oak Hollow Pump Station Generator Addition
The project generally includes site work consisting of erosion control and grubbing; construction of concrete pads for the generator, transformers, transfer switches, and battery cabinets; installation of a pre-purchased 1250kW generator with sub-base fuel tank, transformers, and automatic transfer switches; connection to existing 4160 Vac and 480 Vac services serving the pump station, aeration building, and dam equipment; and coordination with the Owner’s Integrator for required SCADA system modifications.
You need to register or login to view files and more project information.
Plan Holders
| Date | Company | Contact |
| 11/20/25 10:35 am |
ConstructConstruct
3825 Edwards Road
Suite 800 CINCINNATI, OH 45209 |
DPC
Tel: 8003642509
|
| 11/18/25 10:53 am |
State Utility Contractors, Inc.
4417 Old Charlotte Hwy
Monroe, NC 28110 |
David Lucas
Tel: 7042896400
|
