Re-Advertisement - High Point, NC - Oak Hollow Pump Station Generator Addition
The project generally includes site work consisting of erosion control and grubbing; construction of concrete pads for the generator, transformers, transfer switches, and battery cabinets; installation of a pre-purchased 1250kW generator with sub-base fuel tank, transformers, and automatic transfer switches; connection to existing 4160 Vac and 480 Vac services serving the pump station, aeration building, and dam equipment; and coordination with the Owner’s Integrator for required SCADA system modifications.
You need to register or login to view files and more project information.
Addendum #1
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| Addendum #1 | 1.0 MB |
Addendum #2-ReAdvertisement
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| Addendum 2 ReAdvertisement | 345.3 KB |
