High Point, NC - West Green Drive Green Stormwater Infrastructure Project

Provide all labor, materials, equipment, and incidentals to complete roadway, drainage, and stormwater improvements in accordance with the 2024 NCDOT Standard Specifications, Roadway Standard Drawings, and project special provisions. Work includes grading, erosion control, vegetation establishment, installation of SCM cleanouts, check dams, impermeable liners, and drainage structures; concrete and asphalt paving; curb, gutter, and stamped concrete; and foundations for metal poles. All work shall meet City of High Point requirements, BABA provisions, and applicable federal, state, and local regulations, with final acceptance based on specified quality and performance standards.
You need to register or login to view files and more project information.
Date Company Contact
1763036764
11/13/25 12:26 pm
Atlantic Contracting Company Imc
PO Box 49559
Greenboro, NC 27419
Hani Kattan
Tel: 336-931-3109
1763370099
11/17/25 9:01 am
Mountaineer Contractors, Inc
158 James Farm Rd
Statesville, NC 28625
Nicholas Snyder
Tel: 7044026536
1763634833
11/20/25 10:33 am
P&S Grading LLC
PO Box 16606
GREENSBORO, NC 27416
Karen Bolick
Tel: 3366014557
1763129759
11/14/25 2:15 pm
TRIANGLE GRADING & PAVING, INC.
1521 HUFFMAN MILL RD
BURLINGTON, NC 27215
Stephanie Bass
Tel: 3365841745
1763110266
11/14/25 8:51 am
Yates Construction Co., Inc.
9220 NC Hwy 65
Stokesdale, NC 27357
Leslie Gaines
Tel: 336-548-9621