Bennettsville, SC - Lime Slurry Feed System For The Lake Wallace Water Treatmant Plant
The work to be done consists of furnishing all materials, equipment and labor necessary to construct the Lime Slurry Feed System, consisting of a Packaged Lime Storage Tank and Metering Pump Enclosure with associated equipment, Concrete Containment and Tank Pad, Yard Piping, Site Work and Electrical Work.
You need to register or login to view files and more project information.
Plan Holders
Date | Company | Contact |
10/1/25 7:49 am |
Basinger Contracting Company
4808 Waxhaw Farms Road
Waxhaw, NC 28173 |
Jake Basinger
Tel: 704-737-2072
|
10/2/25 12:39 pm |
ConstructConstruct
3825 Edwards Road
Suite 800 CINCINNATI, OH 45209 |
Construct Connect
Tel: 18003642059
|
10/8/25 8:25 am |
Cove Utility
107 W Montclair Ave
Greenville, SC 29609 |
Jeff Caffery
President
Tel: 8645055017
|
10/1/25 10:18 am |
Harper General Contractors, Inc.
312 East Coffee Street
Greenville, SC 29601 |
Anna Reynolds
Tel: 8643606497
|
10/8/25 4:53 pm |
Langston Construction Company
125 Langston Rd
Piedmont, SC 29673 |
Lukus Andes
Estimator
Tel: 864-295-9156
Fax: 864-295-9160
|
10/2/25 11:39 am |
North American Construction Company
124 W McIver Road
Florence, SC 29501 |
Brian Strange
Estimator
Tel: 8436871715
|
10/8/25 2:22 pm |
Republic Contracting Corp.
869 Pepper St
Columbia, SC 29290 |
Medina Thurmond
Tel: 803-783-4920
Fax: 803-783-1623
|
10/1/25 1:21 pm |
State Utility Contractors, Inc.
PO Box 5019
Monroe, NC 28111-5019 |
David Lucas
Chief Estimator
Tel: 704-289-6400
Fax: 7042820590
|
10/2/25 10:16 am |
WGK Construction LLC
4460 Brookfield Corporate Drive
Suite D Chantilly, VA 20151 |
Kyle Drumheller
Vice President
Tel: 434-327-8558
|