Abbeville, SC - Hospital Pump Station Upgrades
The Project consists of removing the existing pump station, replacing the existing suction lift pumps with submersible chopper pumps; site grading; constructing a retaining wall; installation of a valve pit, piping, electrical and controls; and installation of fencing.
You need to register or login to view files and more project information.
Bid Set
(click to expand/collapse)

Name | Size | ||
299.33 Abbeville Hospital PS Upgrades REL A 25.06.19 | 9.3 MB | ||
Bidding Documents 6.23.25 | 3.5 MB | ||
_Technical Specifications 6.19.25 | 3.7 MB |