Gaston County, NC - Sheriff’s Office Floor Repair and Painting Project
The selected contractor will be responsible for removal and disposal of existing flooring and rubber base, leveling approximately 550SF of concrete floor with Shaw Contract Primer “or equal”, self-leveling, Quickfil (epoxy joint filler), and skim patch, normal floor prep and patching required for proper flooring installation using Shaw Contract “or equal” cementitious materials, installation of new Shaw Contract “or equal” flooring and carpet tile with proper transitions between different floor finishes, remove existing signage hangers and brackets from walls, patch any holes and cracks, flat latex over patch areas, paint two (2) coats of specified paint on walls and sanded door frames, installation of new rubber base, wall protection, and corner guards. Work will take place in corridors, offices, restrooms, training and meeting rooms. County staff will be responsible for packing personal items in offices, but the contractor will be responsible for move-management, providing protection of building, equipment, and furnishings. Daily cleanup of material and affected area is required to prevent dirt transfer to other areas of the office and hazardous working conditions for County staff and contractor’s employees. Full post-construction cleanup at completion of each phased area. An on-site superintendent will be required to coordinate services and supervise staff. Include 8% overage on materials. Reference Shaw Contract Commercial flooring and accessories pricing for Sourcewell Contract #061323-SII.
You need to register or login to view files and more project information.
Addendum #1
(click to expand/collapse)

Name | Size | ||
Addendum 1 | 1.9 MB |
Addendum #2
(click to expand/collapse)

Name | Size | ||
Addendum #2 | 836.5 KB |
Addendum #3
(click to expand/collapse)

Name | Size | ||
Addendum 3 | 157.6 KB |
Addendum #4
(click to expand/collapse)

Name | Size | ||
Addendum #4 | 1.8 MB |