Mount Holly, NC - Mount Holly Engineered Wetland

This project shall include the following: Removal of a portion of existing stormwater pipe and excavation for the installation of an engineered wetland. Protection of in place utilities, selective removal of existing trees, clear and grubbing, and grading. The project shall also include installation of one outlet control structure and plant material per plans.
You need to register or login to view files and more project information.
Addendum #1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
000108 Front End 299.6 KB
2025-04-01-Mt Holly Wetland Addendum Memorandum 150.1 KB
CMO22005-C3.00_Addendum 1 3.5 MB
CMO22005-L5.00_Addendum 1 4.1 MB
CMO22005-X.dwg 1.2 MB
donotreply@mtholly.us_20250328_141540 18.2 KB