Goldsboro, NC - Wayne Executive Jetport Airfield Drainage Improvements Ph2 ( 20240329.00.WK)
The project will consist of airfield storm drainage improvements to include ditch grading, replacement of existing drainage pipes and structures, and installation of new drainage pipes and structures. The project includes approximately 15,000 cubic yards of unclassified excavation and approximately 2,500 cubic yards of embankment in place.
You need to register or login to view files and more project information.
Bid Set
(click to expand/collapse)

Name | Size | ||
GWW ARFLD DRNG PH2 PLAN SET | 25.0 MB | ||
GWW ARFLD DRNG PH2 SPECS | 6.0 MB |