High Point, NC - Ward Water Maintenance Facility Building Project, Bid 16-041725

The installation of the new building addition at the High Point Maintenance Facility. The individual scope items generally include the following as shown on the Construction Drawings. a. Erosion control and temporary seeding b. Selective site clearing and demolition c. Unclassified mass grading and fine grading d. Underground water supply and storm drainage improvements e. Electrical improvements f. Parking and infrastructure improvements g. Sidewalk and concrete flat work h. Maintenance building (6,000 SF)
You need to register or login to view files and more project information.
Addendum #1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addendum #1 498.1 KB