Mt Holly, NC - Construction of the South Gateway Connector Road Phase 1
The project involves the construction of approximately 900 linear feet (LF) of new public roadway connecting to YMCA Drive. The proposed roadway will consist of two 13-foot travel lanes and a 10-foot multi-use path to accommodate vehicular, pedestrian, and cyclist traffic. The scope includes associated storm drainage improvements to ensure proper water management, curb ramps for ADA compliance, and the installation of a guardrail where necessary for safety.
You need to register or login to view files and more project information.
Status
Accepting Bids
Prebid Date | 1/29/25 10:00am |
Bid Date | 2/13/25 10:00am |
Company & Contacts
City of Mount Holly
Elizabeth Bell
Location
Mt Holly, NC
For information regarding this project during the bid phase contact:
Elizabeth Bell
City of Mount Holly
Office #: 704-951-0074 Ext:1003
E-mail: Elizabeth.bell@mtholly.us