Mt Holly, NC - Construction of the South Gateway Connector Road Phase 1

The project involves the construction of approximately 900 linear feet (LF) of new public roadway connecting to YMCA Drive. The proposed roadway will consist of two 13-foot travel lanes and a 10-foot multi-use path to accommodate vehicular, pedestrian, and cyclist traffic. The scope includes associated storm drainage improvements to ensure proper water management, curb ramps for ADA compliance, and the installation of a guardrail where necessary for safety.
You need to register or login to view files and more project information.

Status

Accepting Bids

Prebid Date 1/29/25 10:00am
Bid Date 2/13/25 10:00am

Company & Contacts

City of Mount Holly
Elizabeth Bell  

Location

Mt Holly, NC

For information regarding this project during the bid phase contact:

Elizabeth Bell

City of Mount Holly

Office #: 704-951-0074 Ext:1003

E-mail: Elizabeth.bell@mtholly.us

- Any Plan holder requesting a CAD file will need to sign the 'LD_ElectronicFilesReleaseForm-1.pdf' form found under the "Documents" section (above) on this post and email the completed form to Elizabeth Bell by clicking HERE