Harleyville, SC - Wastewater Treatment Plant Expansion
Status
Bidding Closed
Prebid Date | 9/30/24 10:00am |
Bid Date | 10/22/24 2:00pm |
Location
Harleyville, SC
For information regarding this project please contact:
Dan Huggins
Ardurra Group, Inc.
843-670-1402
Bids will be received for a single prime Contract. Bids shall be on a unit price basis as indicated in the Bid Form.
Bid security shall be furnished in accordance with the Instructions to Bidders.
A Bid must be accompanied by Bid security made payable to the Owner in an amount of 5 percent of the Bidder’s maximum bid price.
The project is being funded by a loan from the State Revolving Fund and bidders must comply with all applicable state and federal requirements identified in the bid documents including Davis-Bacon and “American Iron and Steel” provisions.
This project is being funded in whole or in part by the South Carolina Infrastructure Investment Program (SCIIP), which is administered by the South Carolina Rural Infrastructure Authority (RIA) and funded by federal State and Local Fiscal Recovery Funds (SLFRF) through the American Rescue Plan Act (ARPA). All federal SLFRF requirements and SCIIP requirements will apply to the contract. All contractors and subcontractors are required to be registered in the federal System for Award Management (SAM) and may not be debarred from doing business with the federal government. Respondents on this work will be required to comply with all applicable federal regulations, including those listed in the SCIIP Project Management Procedures and the bid documents.
Contractors shall have a classification of WP.
No bidder may withdraw the bid within 90 days after the actual date of the opening and thereof.