Lake City, SC - Graham Road Pump Station Relocation
Status
Bidding Closed
Bid Date7/11/24 2:00pm
Company & Contacts
Location
City of Lake City,SC
For information regarding this project please contact:
Jennifer Ruiz
AECOM Technical Services, Inc.
Bidders must comply with Title VI of the Civil Rights Act of 1964, the Davis-Bacon Act, the Anti-Kickback Act, the Contract Work Hours and Safety Standards Act, and 40 CFR 33.240.
Bidders are advised that this project is funded in part by Clean Water Revolving Fund (CWSRF) which requires assistance recipients to follow American Iron and Steel requirements and use iron and steel products that are produced in the United States.
Bidder must be an official planholder for bid to be considered.
Bidders must deposit security with all bids. Security shall be in the form of a certified check or bid bond made payable to the Owner,and shall be for an amount equal to not less than five percent (5%) of the amount of the bid. Provisions of the security shall be as described in the Information for Bidders. A one hundred percent (100%) payment bond and performance bond will be required. Contractor must provide fire, extended coverage, vandalism, and malicious mischief insurance equal to the actual value of the insured property during construction.
The project is being funded (in part) by a loan from the State Revolving Fund and therefore bidders must comply with all applicable State and Federal requirements identified in the contract documents.
No bid will be considered unless the bidder is legally qualified under the provisions of the South Carolina Contractor's Licensing Law (South Carolina Code of Laws as amended on April 1, 1999, Chapter 11, Sections 40-11-10 through 40-11-428).
Contractors shall have a classification of WP .
No bidder may withdraw the bid within 90 days after the actual date of the opening and thereof.
These bid documents will be modified only by written addenda.
The Owner reserves the right to waive any informalities or to reject any or all bids.