Raleigh, NC - Glenwood-Creston Drainage Project

The Project consists generally of the following major items: Approximately 1100 linear feet of pipe rehabilitation (UV GRP CIPP Lining), pipe replacement, injection grouting, soil stabilization, drainage structure rehabilitation, paving, and traffic control.
You need to register or login to view files and more project information.

Status

Accepting Bids

Prebid Date 11/13/24 2:00pm
Bid Date 12/12/24 3:00pm

Company & Contacts

City of Raleigh
Erik Mayr  

Location

Raleigh, NC

Documents

For further information regarding this project, contact:

Erik Mayr

City of Raleigh, Storm Water Management

erik.mayr@raleighnc.gov

919-996-4077

Engineer: Kimley-Horn and Associates, Inc., 421 Fayetteville Street Suite 600, Raleigh, NC 27601

After Bids are opened, the Owner shall evaluate them in accordance with the methods and criteria set forth in the Instructions to Bidders. The Owner/City Council reserves the right to waive any informality or to reject any or all Bids. Unless all Bids are rejected, Award will be made to the lowest responsible and responsive Bidder, taking into consideration quality, performance and the time specified in the Bid Form for the performance of the Contract.

Requirements for pre-bid submittals of an “or-equal” are required within 10 days of the issuance of the Advertisement for Bids and in accordance with Section 00200, Instructions to Bidders.

Bidders will be required to show evidence that they are licensed to perform the work in the Bidding Documents as required by North Carolina General Statute, Chapter 87 and the Instruction to Bidders.

Bid Security in the amount of five percent (5%) of the Bid must accompany each Bid and shall be subject to the conditions provided in the Instruction to Bidders.

Pursuant to General Statutes of North Carolina Sections 143-128.2 and 143-131, and in accordance with City policy, the City of Raleigh encourages and provides equal opportunity for certified Minority and Woman-Owned Business Enterprise (MWBE) businesses to participate in all aspects of the City’s contracting and procurement programs to include Professional Services; Goods and Other Services; and Construction. The prime contractor will be required to identify participation of MWBE businesses in their Bid, and how that participation will be achieved.

Furthermore, the City’s goal is to contract or sub-contract fifteen percent (15%) of the contract amount to certified MWBEs on construction projects over $300,000, or with contracts that include $100,000 or more in state funding.