Angola, IN - Install Wildlife Perimeter Fence (17051)

The scope of the project includes construction of a 10-foot-tall perimeter wildlife exclusion fence surrounding the airport. Major work elements include fence line clearing, fence construction through wetland areas*, demolition of existing 4’ farm and chain-link fence and construction of a chain-link wildlife fence with barbed-wire top, and angled wildlife skirting buried under the ground (approximately 2-feet deep angled approximately 4-feet out from the base of the fence). The project also includes the construction of double-swing vehicle gates surrounding the perimeter of the fence, and within the terminal and T-hangar areas of the airport, two pivot gates with electric gate operators, two manual pedestrian gates, and associated pavement.
You need to register or login to view files and more project information.

Status

Bidding Closed

Prebid Date7/9/24 2:00pm

Bid Date7/19/24 2:00pm

Company & Contacts

Delta Airport Consultants
Cindy Chavez  

Location

Angola, IN

For information regarding this project please contact:

Steve A. Potoczak

Delta Airport Consultants, Inc.

spotoczak@deltaairport.com

Bids must be accompanied by a certified check or a bid bond in the amount of not less than five (5) percent of the total amount bid. A Contract Performance Bond and a Contract Payment Bond each equal to 100 percent of the Contract Price will be required for the successful Contractor.

No bid may be withdrawn for a period of 60 calendar days after the date of receiving bids.